Frameless Glass Partition System Green Brook Township NJ

Project Type: Commercial Interior Glass Partitions
Location: 239 US 22, Green Brook Township NJ, 08812
Client : GRA DESIGN STUDIO
System Height: 96”
Glass: ½″ Clear Tempered Safety Glass

Project Overview

This project involved the fabrication and installation of a frameless glass partition wall system for a [type of office: architectural, accounting, corporate, medical, etc.] office located in [City, State].

The objective was to create clearly defined offices and meeting spaces while maintaining visual openness, natural light, and a modern commercial aesthetic.

Scope of Work

  • Fabrication and installation of frameless glass partition walls

  • Glass walls and doors for offices and conference rooms

  • [Butt-glazed / minimal-framed] glass panel configuration

  • Frameless swing glass doors with patch fitting hardware

  • Clear anodized aluminum top track and bottom U-channel

  • Field measurement, fabrication, delivery, and installation

Total Doors Installed: [#]

System Specifications

  • Glass Type: ½″ clear tempered

  • System Type: Frameless interior glass partitions

  • Glazing Style: Butt-glazed / patch fitting HW

  • Top Track: 13/4” x 4”

  • Bottom U-Channel:1”x 1” U-Channel

This system was selected to meet commercial interior standards while preserving a clean, transparent appearance.

Areas Enclosed with Glass

  • Conference Room – Glass wall + door

  • Private Office 1 – Glass wall + door

  • Private Office 2 – Glass door only / door with sidelight

  • Administration / HR – Glass wall + door

  • Additional rooms as needed

Additional return panels and sidelights were incorporated where required to complete the layout and maintain alignment.

Door Hardware & Finishes

  • Frameless all-glass swing doors

  • Patch fitting hardware (top and bottom)

  • Concealed closers where required

  • [Handle model / Back-to-back pulls]

  • Clear anodized aluminum framing components

All hardware was selected for durability and minimal visual impact.

Installation Process

  • Field measurement and layout verification

  • Glass fabrication to approved dimensions

  • Delivery and on-site material handling

  • Installation of glass walls, doors, and sidelights

  • Door alignment and hardware adjustment

  • Final cleaning and polishing of all glass surfaces

Installation was coordinated with the client and other trades to maintain project schedule.

Final Result

The completed installation delivers a bright, modern office environment with clearly defined spaces, strong visual continuity, and improved natural light flow.

This frameless glass partition system provides long-term flexibility and a professional appearance suitable for daily commercial use.

Planning a Similar Project?

We fabricate and install custom frameless glass partition systems for offices and commercial interiors throughout North Jersey and NYC.

Ready to Start Your Project?

Call Delta Glass NJ at (201) 214-3779 for a consultation, email us at deltaglassestimates@gmail.com, or **request a detailed quote online**.

We serve businesses throughout **Bergen County, Hudson County, Passaic County, and the greater North Jersey region.**